期刊文献+

岭澳核电站二期18个月换料燃料管理研究 被引量:3

Fuel Management Study on 18-Months Fuel Cycle for Ling’ao Phase-II Nuclear Power Station
下载PDF
导出
摘要 对岭澳核电站二期从首循环开始向18个月换料过渡,并于第四循环达到平衡循环的燃料管理策略进行了研究,包括对燃料循环长度的计算、可燃毒物的使用、堆芯装载方式的布置、主要中子学参数计算等。从燃料管理的角度论证了岭澳核电站二期18个月换料的可行性,为最终的燃料管理方案的确定提供一定的理论依据。 A typical 18-months fuel cycle strategy is introduced in this paper.It deals with the transition towards 18-months reload from the first cycle and reaching equilibrium cycle through the minimum cycles at Ling’ao Phase-II Nuclear Power Station.Cycle length,gadolinium use,loading pattern,as well as main key safety parameters are given.The fulfillment of the study demonstrates the feasibility of launching 18-month reload at Ling’ao phase-II and offers theoretical basis for determining the final fuel management...
出处 《核动力工程》 EI CAS CSCD 北大核心 2005年第S1期45-47,共3页 Nuclear Power Engineering
关键词 岭澳核电站 18个月换料 燃料管理 Ling’ao nuclear power station 18-months fuel cycle Fuel management
  • 相关文献

同被引文献9

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部