3[3]J.D. Madill, A. Scholes, A. S. Normanton, A. Robson, D. Stamp: Continuous Casting Development at British Steel. 1998 Steelmaking Conference Proceedings, Chicago , USA. 1998. 285~289.
4[4]H. Preissl, T. Faster, Automatic Quality Control of Cast Slabs at the VOEST-ALPINE Steel Works. 1995Steelmaking Conference Proceedings, Dallas , USA. 1995. 621~627.
5[5]Johannes Schwedmann, Dr. Jürgen Wochnik: Instrumentation System, Automation Control and Quality Control for Products of the Continuous Casting Process. The Second International Conference on Continuous Casting of Steel, Wuhan, China. 1997. 356~363.