摘要
湖南芙蓉变配套送出线路中的 110kVXLPE绝缘电缆 ,被意外损伤 ,经处理后 。
The fault was found in insulation of 110kV XLPE cable of feed line of Furong, Hunan. The treatment was carried out and the result was satisfied.
出处
《高电压技术》
EI
CAS
CSCD
北大核心
2004年第z1期18-19,共2页
High Voltage Engineering
关键词
电缆
施工
损伤补修
cable construction injury repairing