期刊文献+

桩基础施工诱发岩溶地面塌陷的形成机制与防治方法研究 被引量:4

Surface Collapse Mechanism Induced by Pile Foundation Construction and Prevention Method in Karst Region
原文传递
导出
摘要 在岩溶地区进行桩基础的施工过程中经常会破坏地基岩 (土 )层的平衡条件和地下水动力条件 ,从而诱发地面塌陷等地质灾害。该文分析了人工挖孔桩、钻 (冲 )孔桩等不同类型的桩基础施工工艺在岩溶发育地区诱发地面塌陷和地面沉降的机制 ,并针对不同的成桩工艺、场地工程地质条件和地下水动力条件 ,给出了相应的防治方法。 Ground water dynamic and bedrock(subsoil) equilibrium were destroyed in pile foundation construction process in karst region, so that induced the geology disaster such as surface collapse.This paper analyzed surface collapse and settlement mechanism induced by pile foundation construction ,such as excavated pile and bored pile in Karst region .The prevention methods were given according to different arts of pile construction and engineering geology and ground water dynamic conditions.
出处 《勘察科学技术》 2004年第1期52-55,共4页 Site Investigation Science and Technology
关键词 岩溶 桩基础 诱发机制 防治 地面塌陷 karst pile foundation induce mechanism prevention surface collapse
  • 相关文献

同被引文献16

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部