在上公山TBM的施工过程中,频繁的卡机成了制约和影响施工的主要因素。以2.22卡机事故为例,从主要的工程地质方面分析该卡机事故,以期获得卡机事故的一般规律及应对措施,为以后的类似事故做参考,提高施工效率。
During the course of the TBM construction in Shanggongshan Tunnel,the TBM blockage occurs frequently.So the blockage has become the main control factor of the TBM construction.Base on the 2.22 blockage accident,engineering geological analyses are carried to search for the general rules of TBM blockage and countermeasures.
出处
《岩石力学与工程学报》
EI
CAS
CSCD
北大核心
2004年第z1期4544-4546,共3页
Chinese Journal of Rock Mechanics and Engineering
关键词
隧道工程
TBM施工
TBM卡机
不良地质条件
tunneling engineering,TBM construction,TBM blockage,adverse geological condition