期刊文献+

列车荷载对平行换乘地铁车站深基坑变形影响 被引量:9

Study on deep deformation of parallel transfer metro stationcaused by vehicle load
下载PDF
导出
摘要 根据地铁车站轨道结构的特点,利用集总参数法建立了轮轨竖向耦合振动模型;分析了新建地铁车站深基坑开挖过程中既有车站内的轮轨接触荷载对车站结构及其周围土层变形的影响。通过计算分析认为,列车荷载引起的结构变形在允许值的 7 %范围以内,引起的地面沉降在允许值的 3 %范围以内。 Based on the characteristic of subway track structure, vertical wheel/track coupled dynamic model is established by lumped parameters method. The structure deformation of old metro station and ground settlement in proximity by vehicle contact load is analyzed during the deep excavation of nearby new transfer metro station. From calculation analysis, the structure deformation caused by vehicle load is within 7 percent of allowable value, and the ground settlement is within 3 percent.
出处 《岩土力学》 EI CAS CSCD 北大核心 2004年第z2期375-378,382,共5页 Rock and Soil Mechanics
关键词 地下铁道 轮轨接触荷载 基坑 变形 subway wheel/track contact load foundation pit deformation
  • 相关文献

参考文献5

二级参考文献15

  • 1孙长胜.地铁黄陂南路车站逆筑法结构设计的特点和创新[J].地下工程与隧道,1994(3):2-9. 被引量:4
  • 2李军世,李克钏.高速铁路路基动力反应的有限元分析[J].铁道学报,1995,17(1):66-75. 被引量:67
  • 3蔡英.高速铁路路基的研究[M].西南交通大学,1995..
  • 4梁波 蔡英.土工合成材料用于高速铁路路基的变形控制.西南交通大学百年校庆论文集(土木分册)[M].成都:西南交通大学出版社,1996.9-13.
  • 5梁波,西南交通大学百年校庆论文集.土木分册,1996年,9页
  • 6蔡英,高速铁路路基的研究,1995年
  • 7国家“八五”科技攻关项目,1995年
  • 8西南交通大学铁道系课题组,道床与基床监测及检定技术研究——基床部分报告之四,1993年
  • 9须长诚,铁道总研报告,1991年,5卷,10期,175页
  • 10铁道部科情所(编译),国外高速铁路技术发展研究资料之四——法国TGV高速铁路,1991年

共引文献332

同被引文献73

引证文献9

二级引证文献52

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部