人工土层冻结法加固在盾构出洞施工中的应用 被引量:53

Application of artificial soil freezing reinforcement method to shield tunneling setting out
下载PDF
导出
摘要 软土地区盾构出洞施工中洞口土体易失稳、渗水,上海明珠线二期工程浦东大道站至张扬路站区间,隧道在盾构出洞施工中,为确保地面建筑及地下管线的安全及正常使用,首次采用了人工土层冻结加固,取得了良好的效果;本文介绍了该工程出洞口土体加固的方案选择、关键技术处理及实际取得的效果,并探讨了人工土层冻结加固在含水松软土层的地下工程中的应用前景。 For shield tunneling in the soft-soil area, in view of the soil mass failure and creepage caused by shield tunneling setting out, during the construction of the tunnel between Pudong Wide Road station and Zhangyang Road station of the Shanghai Rail Transit Pearl Line Stage 2, in order to assure a safety and normal usage of the underground pipelines and ground buildings, artificial soil freezing reinforcement method was applied to the shield tunneling setting out for the first time; and it has achieved good effectiveness. This article describes the project in detail, for instance, the choice of reinforcement scheme, key technologies and the practical effectiveness of this method; and discusses the applied prospect of artificial soil freezing reinforcement method for underground engineering in aqueous soft-soil area.
机构地区 上海大学土木系
出处 《岩土力学》 EI CAS CSCD 北大核心 2004年第z2期449-452,共4页 Rock and Soil Mechanics
关键词 盾构出洞 隧道施工 人工土层冻结 土体加固 shield tunneling tunneling work artificial soil freezing method soil body reinforcement
  • 相关文献

参考文献7

二级参考文献7

  • 1-.地层冻结工程技术和应用:中国地层冻结工程40周年论文集[M].北京:煤炭工业出版社,1995..
  • 2王莉莉.日本盾构隧道施工技术译文集[R].中铁隧道集团科研所情报室,..
  • 3中国地层冻结工程40周年论文集,1995年
  • 4陶龙光,城市地下工程,1996年
  • 5Ground Freezing 2000. Proceedings of the International Symposium on Ground Freezing and Frost Action in Soils . 2000
  • 6李宁,G.Swoboda.当前岩石力学数值方法的几点思考[J].岩石力学与工程学报,1997,16(5):502-505. 被引量:41
  • 7崔广心.深土冻土力学——冻土力学发展的新领域[J].冰川冻土,1998,20(2):97-100. 被引量:55

共引文献280

同被引文献318

引证文献53

二级引证文献398

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部