期刊文献+

新疆沙雅县新垦农场竖井排灌工程地下水资源量构成分析 被引量:3

A CONSTITUTE ANALYSIS OF GROUNDWATER RESOURCE IN SILO DRAINAGE AND IRRIGATION ENGINEERING IN XINKEN FARMLAND, XINJIANG PROVINCE
下载PDF
导出
摘要 从传统的均衡法和先进的数值模拟法相结合的角度,讨论了新垦农场现状条件和实施竖井排灌工程后地下水资源量各子项的构成情况,这对正确认识与评估实施结然力克水库替代工程的合理性和可持续发展问题具有重要意义。通过均衡法计算在结然力克水库替代工程实施后地下水补给资源量为1968.49×10~4m^3/a,数值模拟方法计算地下水补给量为2 022×10~4m^3/a,因而以竖井排灌的方式开发1 000×10~4m^3/a的地下水是有补给保证的。 Xinken farmland of Shaya-county is located in the Weigan River fine-soil plain which is southern to Tianshan Mountain, and its southward adjacent the floodplain of Tarim River. It is the typical mainland arid climate in this area. As one part of Jieranlike Reservoir substitute scheme for immediate synthesis utilization program for Tarim River drainage-area, the Silo Drainage and Irrigation Project(SDIP) of Xinken farm intend to exploit groundwater 1000×10~4 m^3/a. On one hand, it can displace the surface wa...
出处 《地球科学进展》 CAS CSCD 2004年第S1期193-196,共4页 Advances in Earth Science
关键词 新疆沙雅县 新垦农场 水资源量 数值模拟 竖井排灌 Groundwater balance Numerical simulation Silo drainage and irrigation Xinjiang Shaya county.
  • 相关文献

参考文献2

  • 1Chiang,W-H,Kinzelbach,W. Processing MODFLOW: a simulation system for modelling groundwater flow and pollution . 1998
  • 2McDonald,M. G,Harbaugh,A. W.A modular three-dimensional finite-difference ground-water flow model. USGS Open File Report 83-875 . 1988

同被引文献59

引证文献3

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部