期刊文献+

项目管理中资源配置的新思路 被引量:1

New Thinking of Resource Allocation in The Project Management
下载PDF
导出
摘要 本文介绍了目前项目管理中的资源配置现状,指出了资源约束下的进度安排工作中存在的问题和资源平衡中存在的问题,分析了问题的原因。最后针对每一种存在的问题,提出了解决的新思路。 The present situation of resource allocation in project management is introduced in this paper,at the same time,the problems which exist in the resource leveling and scheduling activities of resource-constrained are presented,the reason for the prob-lems is analysed.Finally,the new thinking which is directed against each problem is also described.
出处 《价值工程》 2003年第z1期64-67,共4页 Value Engineering
关键词 资源配置 资源平衡 实用法 最优化模型 重心定理 序偶亏值定理 资源日历 资源使用日历 resource allocation resource leveling heuristic optimal model theorem of core theorem of ordinal even lose which indicate delay in time limit for a project resource calendar resource calendar which is being used
  • 相关文献

参考文献5

  • 1[1]Farid,F.,and S. Manoharan. "Comparative Analysis of Resource-Allocation Capabilities of Project Management Software Package." Project Management Journal,June 1996.
  • 2[2]Davis,E.W.,and J.H.Patterson."A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling."Management Science,April 1975.
  • 3[3]Stinson,J.P.,E.W.Davis,and B.Khumawala."Multiple ResourceConstrained Scheduling Using Branch and Bound."AIIE Transactions,September 1978.
  • 4[4]Talbot,F.B."Project Scheduling with Resource Duration Interaction:The Nonpreemptive Case."Working Paper No.200,Graduate School of Business Administration,Ann Arbor, MI:University of Michigan,January 1980.
  • 5[11]许成绩总主编.现代项目管理教程.中国宇航出版社,2003.

同被引文献2

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部