项目管理中最低成本加快方法的人机对话模型及算法设计

AMan-Machine Interaction Model and Its Algorithm for Compression of Time at Least Cost in Project Management
下载PDF
导出
摘要 分析传统的最低成本加快方法在实际应用中的不足,提出一种新的最低成本加快方法----人机对话模式与相应的算法。 The defect of the traditional compression of time at least cost in project management was analyzed in this paper,on this basis a new model for compress time at least cost--man-machine interaction and relative algorithm were put forward.
出处 《价值工程》 2003年第z1期126-128,共3页 Value Engineering
关键词 人机对话 最低成本加快 关键网络 截集 主关键路线 次关键路线 Man-Machine Interaction Compression of Time at Least Cost Key Network Cut Set Main Critical Path Sec-ondary Critical Path
  • 相关文献

参考文献4

  • 1[1]Archibald,R.D.Managing High Technology Programs and Projects. New York:Wiley, 1992.
  • 2[2]Rosenau,M.D.,Jr. Successful Project Management,2nd ed. New York:Van Nostrand Reinhold,1991.
  • 3[3]Marshall Cline,Greg Lomow,Mike Girou. C++ FAQs. Addison Wesley .
  • 4[4]《运筹学》教材编写组编.运筹学.清华大学出版社,1993.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部