5[7]Takashi Aihara,Osaka Gas builds 13 -mi, 30 -in. pipeline 131ft under seabed, International Construction Report, Nov - Dec,Feature Article ,2001,84 (11).
6[9]M Katou,T. Kawamoto, A Minezaki, A Imoto, Development of a segment with steel - pipe - inserted joint. Modern Tunnelling Science and Technology. Adachi et al(eds) , 2001,851 ~ 856.
7[10]Terry Winteron,Lining trends in the UK [ J]. Tunnels & Tunnelling International ,January 1999,44 ~45.
2HU Jie, ZHANG Yujun, LI Peng, WANG Hui, HUANG Lan & HU YuanzhongState Key Laboratory of Tribology, Tsinghua University, Beijing 100084, China,Department of Physics, Tsinghua University, Beijing 100084, China,College of Chemistry and Molecular Engineering, Peking University, Beijing 100871, China.Micro-mechanical analysis of dynamic processes of nanomanipulation[J].Science China(Physics,Mechanics & Astronomy),2004,47(z1):88-92. 被引量:28
10M.Katou , T.Kawamoto,A.Minezaki,A.Imoto.Development of a segment with steel-pipe-inserted joint. Modern Tunnelling Science and Technology.Adachi et al(eds), 2001.