摘要 介绍并分析了清江水布垭工程地下厂房洞室群的锚固方案。在二维分析中比较了无锚工况和有锚工况围岩状况的差异以及不同初始地应力场时的差异。对系统锚杆做了3种不同方案的比较。在三维分析中,比较了3种不同吨位长锚索的加固效果。最后,得出了相应的结论。 The optimazation analysis is described on reinforcing scheme for underground power house of Shuibuya Project.In 2D analysis,the comparison of different rock conditions is made for the cases with and without reinforcement under different initial stresses.Three different schemes for systematical rock bolts are compared.In 3D analysis,the comparison of reinforcing effect is made for 3 schemes of prestress cable with different tonnage. Some relevant conclusions are given finally.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第z1期2127-2131,共5页 Chinese Journal of Rock Mechanics and Engineering
基金 国家自然科学基金重点资助项目(59939190)
关键词 地下工程 地下洞室群 锚固方案优化 2D和3D FEM分析 underground engineering underground power house optimazation of reinforcing scheme 2D and 3D FEM analysis
  • 相关文献

参考文献9

二级参考文献54

共引文献218

同被引文献76

引证文献6

二级引证文献88

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部