摘要 埋深大、线路长的隧洞采用TBM施工,已成为国际上快速开挖隧洞的主流.引黄工程南干线4#~7#隧洞总长90 km,除部分进、出口土洞段外,全部按TBM施工.沿线水文地质条件复杂、埋深大、单条隧洞长达43 km.结合工程施工实践,对TBM施工要点地质洞段的施工对策进行了探讨. TBM is commonly used for deep buried and long tunnels and becomes prevailing technique for tunnel excavation in international practices.The total length of No.4~7 tunnels in South Main of Shanxi province Yellow River Diversion Project(YRDP)is 90 km.The tunnel is excavated by TBM except some soil entranceways. The longest tunnel is about 43 km and hydrological geology of the tunnel is quite complex.According to practical experiences,some construction countermeasures are discussed for TBM constructions in bad geological sites of engineering.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第z1期2520-2522,共3页 Chinese Journal of Rock Mechanics and Engineering
关键词 隧道工程 TBM施工 管片衬砌 不良地质洞段 tunneling engineering TBM construction tunnel lining bad geological sites
  • 相关文献

参考文献10

二级参考文献23

共引文献166

同被引文献36

引证文献4

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部