摘要
介绍DZ系列低温早强高性能混凝土的性能特点、配制方法和在清水河特大桥工程中的应用情况,提出低温早强高性能混凝土的配制与施工是一个系统工程,必须重视其设计配合比、混凝土成形后的保温保湿养护以及相关的工艺措施等各个环节。
An introduction is given to the performance and preparation of DZ series of low temperature early strength high performance concrete and its application to Qingshuihe River Extra-large Bridge. It is regarded that the preparation and construction of this concrete is a system project, and emphasis should be laid on design of mixture ratio , curing of concrete, and related technological measures.
出处
《铁道建筑技术》
2003年第z1期48-53,共6页
Railway Construction Technology
关键词
高性能混凝土
配合比设计
施工
high performance concrete, design of mixture ratio, construction