7Spencer K C.Starting and loading of large steam turbines [ A ] .Proceedings of the American Power Conference [ C ].USA, 1974.
8L Busse. Optimizing the start-up of large steam turbines [J ].BBR,1986, (5) :501-506.
9J Matsumura. Steam turbine start-up method based on predictive monitoring and control of thermal stresses [J].IEEE Transaction on Power Apparatus and System, 1985,104 ( 4 ).