期刊文献+

达钢450m^3高炉全贫瘦煤喷吹生产实践 被引量:1

450M^3 BLAST FURNACE ENTIRE POOR HARD ASH COAL INJECTION PRODUCTION PRACTICE AT DAZHOU IRON AND STEEL GROUP CO. LTD
下载PDF
导出
摘要 达钢450 m3高炉煤粉喷吹系统于2005年建成投产,设计为无烟煤与烟煤混喷。试生产阶段采用无烟煤喷吹,然后进行无烟煤和烟煤混喷并逐渐提高烟煤比例,直至实现全烟煤喷吹。在实现全烟煤喷吹以后,高炉平均风温提高了105℃,冶炼强度提高了0.240 t/m3.d,焦比降低了151 kg/t。因此,全烟煤喷吹这一工艺的成功实现,为达钢集团公司带来了巨大的经济效益。 450 m3 blast furnace powdered coal injection system was completed and put into production in 2005,designed for mixed spurts of the anthracite and the bituminous coal at Dazhou Iron and Steel Group CO.LTD.The trial production stage uses the anthracite injection,then carries on the anthracite and the bituminous coal mixed spurts and gradually enhances the bituminous coal proportion,until realizes the entire bituminous coal injection.After the realization of entire bituminous coal injection,the blast furnace a...
出处 《四川冶金》 CAS 2008年第4期15-17,共3页 Sichuan Metallurgy
关键词 高炉 烟煤喷吹 blast furnace the entire bituminous coal injection
  • 相关文献

同被引文献17

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部