介绍在四川省荥经县泗坪罗家湾电站桥溪沟支洞工程的施工中 。
Some concrete measures and critical techniques to use advance roofbolt shot cycling technique for overcoming technically difficult problems of tunnel portal construction in sandy gravel in construction of the Qiaoxigou branch tunnel of the Luojiawan Hydropower Station,Siping Toiwnship,Yingjing County are described.
出处
《四川地质学报》
2002年第z1期16-18,共3页
Acta Geologica Sichuan
关键词
砂砾石
超前锚杆
短循环
弱爆破
人工开挖
sandy gravel
advance roofbolt
shot cycle
weak blast
manual tunnel excavation