摘要
阐述了广东大亚湾核电站对维修工作过程修改的思路和做法,并提出了今后的改进方向。
The consideration and practices in the modification of the work process of Guangdong Daya Bay Nuclear Power Station is described and the modification direction in the future is given.
出处
《核科学与工程》
CSCD
北大核心
2001年第S1期41-44,共4页
Nuclear Science and Engineering