摘要
以三省公路项目之内蒙古公路项目包头至东胜高速公路第Ⅲ合同段二灰稳定砂砾基层的施工为例 。
Based on the construetion case of base course of lime-flyash stabilized sand-gravel for the Contract No. III, Baotou-Dongsheng Highway, Inner Mongolia Project, Tri-Provincial Highway Projects loaned from World Bank, this article describes the quality control of construction of the sand-gravel base course stabilized with lime-flyash.
出处
《内蒙古公路与运输》
2001年第S1期46-47,共2页
Highways & Transportation in Inner Mongolia
关键词
二灰稳定砂砾
基层
施工
质量控制
lime-flyash stabilized sand-gravel
base course
construction
quality control