摘要
结合向西路地下人行通道工程实例 ,介绍城市饱和含水砂层中采用浅埋暗挖法修建地下人行通道施工方法和配套技术措施。
Introduceing the pedestrian subway construction method works and fitted technical measures with the shallow depth and covered cut method at the saturated sand layer in the city in the light of Pedestrian Subway of Xiangxi-road Works.
出处
《西部探矿工程》
CAS
2001年第z1期178-179,共2页
West-China Exploration Engineering
关键词
人行通道
含水砂层
固结
防坍限沉
监控量测
pedestrian subway
saturated sand
consolidation
collapse and settlement prevention
monitor and measure