摘要
列举了郑州电缆隧道施工的特点及施工中按浅埋暗挖法常规施工会出现的问题 ,介绍了解决这些问题并加快工程进度、保证工程质量、施工安全的措施和经验。
This paper lists the features of the construction of Zhengzhou power cable tunnels and the problems that occur when the construction is carried out in accordance with the conventional excavation method with shallow overburden,and introduces the measures and experience to sove these problems,speed up the construction progress and to ensure the quality and safety of the construction.