摘要
简单介绍了在国家重点工程建设项目朔黄线寺铺尖双线隧道施工过程中 ,使用有轨运输无轨装碴技术的一些经验和看法 ,供读者参考。
This article briefly introduces some experiences on application of rail haulage and and trackless muck-loading technology during the construction of sipujian double-line tunnel on Shuohuang railway,which is state major construction project.It serves as reference for readers.
出处
《西部探矿工程》
CAS
2001年第z1期213-213,226,共2页
West-China Exploration Engineering