摘要
上海市污水治理二期工程是上海市在“九五”期间 ,投资规模最大的环保项目之一 ,介绍建设单位在决策、设计、工程实施各个阶段投资控制。
Shanghai Sewerage Project (Phase Ⅱ) is one of the environmental projects with huge cost in the Ninth Five year Plan in Shanghai. Introduced here is the management of the Employer, including cost control in different stages such as decision making, design and implementation of the project.\;
出处
《中国市政工程》
2001年第z1期57-60,共4页
China Municipal Engineering
关键词
投资控制
目标
办法
具体措施
实施
情况
cost control
objective
method
specific measure
implementation
condition