摘要
北京第二热电厂设备为C50-8.83/0.118型50 MW采暖调节抽汽式汽轮发电机组,由于燃料价格激增造成巨额亏损。为达到减少亏损的目标,将采暖调节抽汽式汽轮机改造成为B50-8.83/0.118采暖背压式汽轮机,转变成以供热为主供电为辅的经营方式,企业的经济效益明显好转。
Beijing No.2 Cogeneration Power Plant,with C50-8.83/0.118 type 50 MW steam extraction turbine-generator units installed,suffered from great deficit arising from the going up of fuel price in the recent years.With the aim of reducing the deficit,the steam extraction-district heating turbines were modified to back pressure-district heating turbines through retrofitting,with the operation mode converted to with district heating as principal,power supply as complement,thus the economic benefit of enterprise has taken an evident turn for better.
出处
《中国电力》
CSCD
北大核心
2001年第9期66-67,共2页
Electric Power
关键词
调节抽汽式汽轮机
机组改造
背压式汽轮机