摘要
小山电站为松江河梯级电站中一级引水式水电站,其调压井的开挖是从原地面到高程 678 m平台的明挖和高程 678 m平台以下的暗挖。文中介绍了小山电站的调压井开挖施工技术。
Xiaoshan water power station is a first step in Songjianghe cascade hydropower station, which is a pressure flow diversion type hydropower station. The surge shaft construction comes down to open earth- rock cut from original ground to 678 m levels and to underground rock cut of under 678 m levels. The paper introduces the project general situation, the geological condition and the excavation technique of the surge shaft construction as emphases.
出处
《东北水利水电》
2001年第1期20-22,28,共4页
Water Resources & Hydropower of Northeast China
关键词
调压井
开挖
小山水电站
surge shaft; excavation; Xiaoshan water power station