1[1]Russell , Skibniewskl. Decision criteria in contractor prequalification .Journal of Management in Engineering ,1988 4(2):148~164
2[2]Russell , Skibniewskl. Qualfier-1: Contractor prequalification model. Journal of Management in Engineering, 1990 4(1):77~90
3[3]Russell , Skibniewskl. Qualifier-2: Knowledge_based system for contractor prequalification. Journal of Management in Engineering, 1990 3(1): 157~171
4[4]Russell. Model for Owner Prequalification of Contractors. Journal of Management in Engineering ,1990 2(1): 59~75
5[5]Jaselskis , Russell. Risk analysis approach to selection of contractor evaluation method. Journal of Construction Engineering and Management, 1992, 11(4): 814~821
6[7]Patrick S. F. , Sonia K. C. Final contractor selection using the analytical hierarchy process. Construction Management and Economic, 2000 18,547-557.
7[8]V. U. Nguyen . Tender evaluation by fuzzy sets . Journal of Construction Engineering and Management,1985(3)231~243
9[10]K.C.Lam,Tiesong HU. Decision support system for contractor pre_qualification artificial neural network model. Engineering Construction and Architectual,2000(7),251~266