摘要
通过对竞价上网方式下机组运行特点分析,提出了在全天负荷下制粉系统运行方式规划,并根据现场特点,对非线性有约束规划方程进行了简化求解。
Through analysis of engine group working feature in the way of competitive price on internet, the author puts forward the plan of the working way of powder- making system, gives simplification and obtain to non-linear binding programming equation according to spot featare.
出处
《山东电力高等专科学校学报》
2001年第2期22-25,共4页
Journal of Shandong Electric Power College
关键词
制粉系统
目标函数
约束条件
powder-making system objective function binding term