北京市109中学人行天桥桩基托换有限元分析 被引量:2

FINITE ELEMENT ANALYSIS OF PILE FOUNDATION UNDERPINNING OF THE 109TH HIGH SCHOOL'S PEDESTRIAN OVERBRIDGE IN BEIJING
原文传递
导出
摘要 北京地铁天坛东门站穿越109中学人行天桥桩基础,采用地面扩大承台并施作新桩与既有桩共同承担上部荷载,在洞内采用直接截桩的桩基托换方案,就此方案对其施工过程进行了数值模拟,通过数据整理与分析,总结出桩基托换引起的承台沉降规律,并根据计算结果与实测结果的比较证明了该托换方案的合理性、可行性。 Based on the Tiantan East-station of Beijing Subway which goes through the pile foundation of the 109th high school's pedestrian overbridge,the underpinning scheme that the newly built pile and the old pile support the upper load is constituted,and in the scheme truncating the pile in the tunnel is also determined. Then the construction process is simulated by FEM software,by means of the data reduction and analysis,summarize the rule of the settlement of cap that is produced by pile foundation underpinning.At last,it is proved that this underpinning scheme is rational and feasible by the comparison of the imitation result and the measured result.
出处 《工业建筑》 CSCD 北大核心 2008年第z1期680-682,共3页 Industrial Construction
关键词 桩基托换 数值模拟 承台沉降 pile foundation underpinning numerical simulation settlement of cap
  • 相关文献

参考文献3

二级参考文献3

共引文献25

同被引文献20

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部