期刊文献+

深厚湿陷性黄土地区大型冷却塔地基处理措施 被引量:11

GROUND TREATMENT OF LARGE-SCALE COOLING TOWER IN DEEP AND THICK COLLAPSIBLE LOESS AREA
原文传递
导出
摘要 对某电厂湿陷性黄土地基上自然通风冷却塔的地基处理方案的选择给予介绍,提出对大型冷却塔,在湿陷性黄土地区,复合地基或换填地基比桩基更有利,当湿陷土层厚度大于10m时,孔内深层强夯(DDC)技术较优,当湿陷土层厚度小于10m时,采用强夯消除湿陷是一个很好的选择。 It is introduced the selection of ground treatment schemes for natural draft cooling tower that will be built on collapsible loess foundation for an electric power plant.The conclusion and recommendations are that a composite foundation or cushion is better than pile foundation for natural draft cooling tower in the collapsible loess district.DDC(down-hole dynamic compaction) is better when the thickness of collapsible loess is more than decameter,and when the thickness is less than decameter,dynamic compaction to erase the collapse is a better choice.
作者 李毅男
出处 《工业建筑》 CSCD 北大核心 2008年第z1期721-725,共5页 Industrial Construction
关键词 湿陷性黄土 冷却塔 地基处理 collapsible loess cooling tower ground treatment
  • 相关文献

参考文献3

二级参考文献1

  • 1GBJ25-90.湿陷性黄土地区规范[S].[S].,..

共引文献33

同被引文献39

引证文献11

二级引证文献7

相关作者

内容加载中请稍等...