某安全壳预应力原位检测试验与吻合分析 被引量:3

ANALYSIS AND IN-SITU-MONITORING OF PRESTRESS TO CONTAINMENT STRUCTURE
原文传递
导出
摘要 核反应堆安全壳预应力结构系统是保障结构正常工作的屏障,为了对预应力系统的有效性作出可行性评估,在整个预应力系统中选取了两根水平环向束作为原位检测束。现场采用VH10000型振弦式测力计进行检测,通过试验实测数据和理论计算相互比较,确定安全壳是否能够投入使用。 Prestressed system is an important safeguard of containment structure.For the evaluation of time dependent losses,two circumferential-horizontal tendons were selected as monitored tendons in situ.In the field experiment VH10000 load cells were introduced.In this paper the differences between practical prestress and theoretical one will be discussed,and finally the conformity between them will be concluded.
出处 《工业建筑》 CSCD 北大核心 2008年第z1期1030-1032,1021,共4页 Industrial Construction
关键词 预应力 长期损失 原位检测 测力计 安全壳 prestress time dependent losses in-situ-monitoring load cell containment structure
  • 相关文献

参考文献3

  • 1[5]Collins M.P.,Mitchell D.Prestressed Concrete Structures.Prentice-Hall,Inc,1991
  • 2[6]熊学玉.预应力结构原理和设计.北京:中国建筑工业出版社,2004
  • 3[7]Reinhardt,Peter and Chadha,G.,Temperature Stresses in Prestressed Concrete Walls of Containment Structure,Journal of the Prestressed concrete Institute,1974,19(1);2-11

同被引文献7

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部