期刊文献+

水土保持生态环境建设项目“捆绑”需要解决的问题

Some issues about project binding in ecological environment construction for soil and water conservation
下载PDF
导出
摘要 水土保持生态环境建设涉及部门多,如何整合项目、发挥国家补助资金的最大效益,宜宾市水利部门进行了积极探索,并在实践中取得了明显成效。但总体来说,整合力度还不够。针对存在的问题,提出了相应的对策。 The ecological environment construction is related with a lot of departments.The departments of water conservancy in Yibin have studied the project binding to realize maximum benefits of the fund from the Central government.Though remarkable results have been achieved in the work,project binding still has a lot of work to do.Some suggestions have been proposed in the paper to solve the existing problems.
作者 向修明
出处 《中国水土保持科学》 CSCD 2008年第z1期105-106,共2页 Science of Soil and Water Conservation
关键词 水保工程 项目捆绑 措施 四川 soil and water conservation project binding measure Sichuan
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部