摘要 为了确定注浆法治理井壁破裂的时间,以某矿副井历年来的井壁受力监测数据为依据,分析了井壁破裂治理前后竖向附加应变的变化规律。结果表明,靠近破坏区上方井壁的应变增量可以作为判别是否需要进行井壁破裂治理的依据;井壁破坏后稳定期内的应变值可以作为井壁二次破坏的预警值;应把井壁发生破坏后的稳定期作为首轮注浆治理时间;首轮注浆结束后,井壁应变积累至破坏后稳定期的应变水平的时间作为第二轮注浆治理时间。分析可知,合理地确定注浆治理时间,可以更大程度地缓释井壁的附加应变,延长井筒的服务年限。 In order to set the time to treat mine shaft liner broking with grouting method,base on the mine shaft liner stressed monitoring and measured data of an mine auxiliary shaft in a mine as the basis,the paper analyzed the variation law of the vertical additional strain before and after the treatment of the mine shaft liner broken.The results showed that the strain increased value of the mine shaft liner near and above the mine shaft liner broken could be the basis of the liner broken treatment or not.After th...
出处 《煤炭科学技术》 CAS 北大核心 2008年第10期25-28,共4页 Coal Science and Technology
基金 国家自然科学基金重点资助项目(50534040)
关键词 井壁破裂 注浆治理时间 应变 mine shaft liner broken grouting treatment time strain
  • 相关文献

参考文献7

二级参考文献25

  • 1鲁普泉,刘百臣.立井井壁断裂综合治理[J].煤炭科学技术,1995,23(7):9-12. 被引量:2
  • 2杨维好,崔广心,周国庆,李毅,陈先德,吕恒林,孟以猛,祝嘉庸,虞咸祥.特殊地层条件下井壁破裂机理与防治技术的研究(之一)[J].中国矿业大学学报,1996,25(4):1-5. 被引量:101
  • 3马英明.立井厚表土层地压的理论与实践[J].中国矿业学院学报,1979,(2):45-69.
  • 4朱松耆.表土层中圆形竖井地压的计算[J].有色金属,1974,(5):13-19.
  • 5马英明.从井壁受力规律谈深井冻结井壁的结构和设计.中国矿业学院学报,1979,(4):59-74.
  • 6Cheng X L,Proceeding of the interational symposium on application of computer methods in rock mechanics and engineering,1993年
  • 7杨维好,全国首届结构与介质相互作用学术会议论文集,1993年
  • 8杨维好,博士学位论文,1993年
  • 9王以全,硕士学位论文,1993年
  • 10周国庆,中国矿业大学学报,1991年,20卷,3期,87页

共引文献236

同被引文献16

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部