摘要 评述了捣固炼焦的工艺及技术特点,对比了顶装焦炉与捣固焦炉的不同,介绍了顶装焦炉改捣固焦炉所需进行的配煤粉碎系统改造、煤塔改造、焦炉机侧整体平台下移等内容。对改造可能遇到的问题进行了分析,并提出了相应的改进措施,认为顶装焦炉改为捣固焦炉具有可行性。 Process and technical features of the stamp-charged coke ovens were given,and the comparison between top-charged coke ovens and the stamp-charged ones were made.The required revamping for the coal blending system and the coal tower,and also the lowering of the integral platform on the machine side of the coke oven were introduced in case top-charged coke ovens are to be changed into stamp-charged ones.Analysis on possible problems that may come across during the change were made,and in the mean time,measure...
作者 粱鸿飞
出处 《煤化工》 CAS 2008年第5期58-60,共3页 Coal Chemical Industry
关键词 顶装焦炉 捣固焦炉 改造 coke oven coking stamping revamping