以国内首个使用Q420圆管为铁塔主材的大跨越输变电工程为背景,进行了6个K形节点的试验研究,分析了受荷后这类节点的截面应力分布、主管侧向位移以及极限状态的特征等受力特性,为验证杆塔设计是否符合Q420高强钢材料性能要求、满足安全运行提供了可靠的依据,并提出了施焊方案,可供设计与施工人员参考.
The experimental research on the steel tubular tower k-joints with Q420 circular steel tubular are performed,in combination with the practical demands of a river crossing transmission construction project,in which steel tubular Q420 is main material of the tower at first in China.It is discussed on the stress distribution,side displacement of main-pipe and features of the ulitimate capability state of the loaded joints.Some useful suggestions of steel tubular tower with steel Q420 are presented.It is reveal...
出处
《武汉大学学报(工学版)》
CAS
CSCD
北大核心
2008年第S1期252-257,共6页
Engineering Journal of Wuhan University
关键词
大跨越
圆管相贯节点
Q420圆钢管
承载力与变形
river crossing
circular tubular joint
yeild capablity 420 steel tubular
capability and deformation