期刊文献+

全空间赤平投影在伦潭水利工程中的应用 被引量:2

Application of Stereographic Projection of Vector in Luntan Water Project
下载PDF
导出
摘要 在伦潭水利工程的设计和施工中,坝址区岩体稳定性评价是非常重要的一个方面,常应用赤平极射投影进行分析,但这一传统的图解法存在一定局限性.为确定对工程稳定性有影响的结构面后,可应用全空间赤平投影作进一步的理论分析,判断出坝基和边坡中的可动块体,以指导岩体稳定性的分析研究和支护设计工作. It s a very important aspect of the stability assessment of rock mass of dam site area in design and construction of Luntan water project,usually using Stereographic projection,but the traditional graphic method has some limitation.So,it can use stereographic projection of vector for further theory analysis,such as judging movable block in dam foundation and side slope after determining structure plane which has influence in the stability of project,that can guide the analysis and study of the stability of ...
出处 《华北水利水电学院学报》 2008年第6期75-77,共3页 North China Institute of Water Conservancy and Hydroelectric Power
关键词 全空间赤平投影 结构面 可动块体 稳定性分析 stereographic projection of vector structure plane movable block stability analysis
  • 相关文献

参考文献9

二级参考文献21

共引文献46

同被引文献17

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部