摘要
结合福州可门火电厂一期工程灰坝工程下坝工程实例对爆破挤淤施工工艺加以论述,该坝区地层岩性较为复杂,爆破挤淤主要置换持力层上的素填土与淤泥。可供相关技术人员对比参考应用。
An example of the project phraseⅠof Fuzhou Kemen power plant would be given so as to demonstrate the technique of Squeezing silt by blasting,The lithologic character of the dam area is fairly complex.This technique programme mainly used certain mixed grave to replace the plain fill and the sea slit in the supporting course.as an information for the relative engineers and technicians.
出处
《福建建筑》
2008年第11期68-70,共3页
Fujian Architecture & Construction
关键词
爆破挤淤
堤头爆填
堤身侧爆填
布药
Mud displacement by blasting Blasting and Filling of the upper dam Blasting and Filling of the levee sides Chamber Blasting