期刊文献+

Decision-making model for risk management of cascade hydropower stations

Decision-making model for risk management of cascade hydropower stations
下载PDF
导出
摘要 In a medium-term electricity market,in order to reduce the risks of price and inflow uncertainties, the cascade hydropower stations may use the options contract with electricity supply companies. A profit-based model for risk management of cascade hydropower stations in the medium-term electricity market is presented. The objective function is profit maximization of cascade hydropower stations. In order to avoid the risks of price and inflow uncertainties, two different risk-aversion constraints: a minimum profit constraint and a minimum conditional value-at-risk, are introduced in the model. In addition, the model takes into account technology constraints of the generating units, which includes reservoir flow balance, reservoir capacity limits, water discharge constraints, etc. The model is formulated as a mixed integer nonlinear programming problem. Because the search space of the solution is very large, a genetic algorithm is used to deal with the problem. In a medium-term electricity market, in order to reduce the risks of price and inflow uncertainties, the cascade hydropower stations may use the options contract with electricity supply companies. A profit-based model for risk management of cascade hydropower stations in the medium-term electricity market is presented. The objective function is profit maximization of cascade hydropower stations. In order to avoid the risks of price and inflow uncertainties, two different risk-aversion constraints: a minimum...
出处 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期22-26,共5页 东南大学学报(英文版)
基金 The National Natural Science Foundation of China (No.50579101)
关键词 cascade hydropower station mixed integer nonlinear programming risk management medium-term electricity market cascade hydropower station mixed integer nonlinear programming risk management medium-term electricity market
  • 相关文献

参考文献7

  • 1Lalancette Simon,Leclerc Frank,Turcotte David.Selective hedging with market views and risk limits: the case of hydro- quebec[].The Quarterly Review of Economics and Finance.2004
  • 2Weron R.Market price of risk implied by Asian-style electricity options and futures[].Energy Economics.2008
  • 3Garca-Gonz lez J,Parrilla E,Mateo A.Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electric- ity market[].European Journal of Operational Research.2007
  • 4Demiroren A,Zeynelgil H L.GA application to optimization of AGC in three-area power system after deregulation[].Inter- national Journal of Electrical Power and Energy Systems.2007
  • 5Oren S S.Integrating Real and Financial Options in Demand-side Electricity Contracts[].Decision Support.2001
  • 6Deng S J,Oren S S.Electricity Derivatives and Risk Management[].Energy.2006
  • 7H Y Yamin,S M Shahidepour.Risk and profit in self-scheduling for GenCos[].IEEE Transactions on Power Systems.2004

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部