摘要
建筑给排水安装工程是建筑工程的一个重要组成部分,通过分析指出提高建筑给排水安装工程的质量水平,应对安装工程的前期、现场施工和后期质量进行全过程质量管理,并对各个过程质量管理内容进行了详细阐述。
Building water & wastewater engineering installation is an important part in building installation. The conclusion is that we should emphasize the pre-period quality control of building water & wastewater engineering installation, onsite construction quality control and post-period quality control to improve the quality of building water & wastewater installation project. All factors of the whole procedure quality control are discussed.
出处
《建筑经济》
北大核心
2008年第S1期190-192,共3页
Construction Economy
关键词
建筑给排水安装
全过程质量管理
施工管理
building water & wastewater engineering installation
the whole procedure quality control
construction management