摘要
介绍了山东电网的现状,分析了山东电力工业的发展情况,论述了特高压电网尽早引入山东的必要性。
The present condition of Shandong power grid is introduced, the development of industry in Shandong is also analyzed, and the necessity of ultra-high voltage grid leading into Shandong with the least delay is illustrated in this paper.
出处
《山东电力技术》
2009年第1期3-6,共4页
Shandong Electric Power
关键词
特高压
电网
分析
UHV
power grid
analysis