重庆南干线整改工程綦江穿越勘察技术

Surveying Technique of Qijiang Traversing of East Section's Improvement Project of South Trunk
下载PDF
导出
摘要 重庆南干线东段安全隐患整改工程綦江穿越重要性等级为一级,查明穿越断面的地层结构、松散地层结构的颗粒组成及其工程地质特性,取得合理岩土参数,对整改工程建设具有重要作用。在地质测绘基础上布置勘探点,开展了原位测试、河流表流速测试并取岩芯样及水样进行室内试验。经施工验证,地质勘察成果与实际地质条件基本吻合。 The grade of Qijiang Traversing of east section s potential risk improvement project of south trunk in Chongqing is class I. It is important for the improvement project that to obtain the stratum structure of traversing cross-section,the particle component of loose stratum structure and its properties of engineering geology,then the reasonable geotechnical parameters. The exploration spots is set on the basis of geology surveying,and there are some tests on these spots such as the in-situ test and the test ...
出处 《土工基础》 2009年第1期36-38,共3页 Soil Engineering and Foundation
关键词 綦江穿越 勘察 工程地质 稳定性评价 Qijiang traversing surveying engineering geology stability evaluation
  • 相关文献

参考文献1

二级参考文献2

  • 1TB 10012--2001,铁路工程地质勘察规范[S].
  • 2GB 50025--2004,湿陷性黄土地区建筑规范[S].

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部