期刊文献+

黄河第6次调水调沙对花园口至夹河滩段河道的影响分析 被引量:2

Impact of the Sixth Integrated Water Regulation of Yellow River on Reach from Huayuankou Station to Jiahetan Station
下载PDF
导出
摘要 概述了2007年黄河第6次调水调沙的运行情况.从水文泥沙过程、调水调沙前后悬移质粒径变化、河道冲淤量及主槽过流能力等方面,分析研究了2007年汛前调水调沙对花园口至夹河滩段河道的影响.分析结果认为,花园口水文站来水量41.01亿m3,花园口至夹河滩河段冲沙0.041亿t,2水文站所在断面主槽过流能力增加幅度为300~500 m3/s,在流量3 000 m3/s时相应水位下降0.03~0.14 m,河段的行洪能力得到明显改善. The course of the 2007 integrated water regulation of the Yellow River is described,then the impact of the integrated water regulation to the reach from Huayuankou station to Jiahetan station before the flood season is focused on,in terms of analyzing the hydrological process of sediment,the changed size of suspended load before and after the regulation,the scour of river flow and the ability to change the main channel,and soon.The results show that there is about 4.101×109 m3 water going through the Huayua...
作者 刘颖
出处 《华北水利水电学院学报》 2009年第1期7-10,共4页 North China Institute of Water Conservancy and Hydroelectric Power
关键词 黄河 调水调沙 花园口至夹河滩河段 Yellow River integrated water regulation river course from Huayuankou to Jiahetan
  • 相关文献

参考文献6

二级参考文献32

共引文献107

同被引文献32

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部