考虑设计迭代和资源冲突的研制系统任务可靠性 被引量:1

Mission reliability of development system based on the design iteration and resource confliction
原文传递
导出
摘要 在研制系统任务过程分析的基础上,综合考虑设计迭代和资源冲突对研制任务完成时间的影响,通过构建多阶段有限状态吸收Markov过程对动态返工概率进行描述,采用排队网络对系统研制过程进行建模与分析,得到了系统和各工作阶段的任务可靠性模型.通过示例对系统研制能力进行了评估,表明了任务可靠度的计算方法. The iteration is one of the basic characteristics in the developing process.The resource confliction is also the important factors affecting the complete of the development mission.The effects of the developing mission time were discussed in consideration of the design iteration and resource confliction simultaneous. Based on the analysis of the development processes,the multiphase,finite states absorbing Markov process was constructed to describe the dynastic iterated probability.The models of the mission ...
出处 《系统工程理论与实践》 EI CSCD 北大核心 2009年第3期186-192,共7页 Systems Engineering-Theory & Practice
关键词 研制系统 设计迭代 资源冲突 任务可靠性 development system design iteration resource confliction mission reliability
  • 相关文献

参考文献2

  • 1[美]华兴,.排队论与随机服务系统[M]上海翻译出版公司,1987.
  • 2Steven D. Eppinger,Daniel E. Whitney,Robert P. Smith,David A. Gebala. A model-based method for organizing tasks in product development[J] 1994,Research in Engineering Design(1):1~13

同被引文献11

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部