摘要
通过秦皇岛市奥体中心体育场桩基工程施工放线的方法,充分说明了在大型工程中利用全站仪放线的高效,快速,灵活。
This paper fully illustrated that the use of Total Station brings out efficience,expeditiousness and flexibility in large- scale projects by introducing the method of Foundation Engineering construction Actinomyces which was used in Qinhuangdao Olympic Sports Center Stadium pile construction
出处
《北京测绘》
2009年第1期76-78,共3页
Beijing Surveying and Mapping
关键词
常规测量
全站仪
施工放线
Conventional surveying
total station
construction Actinomyces