期刊文献+

基于模拟退火算法的多节点订单排序模型 被引量:9

Multi-stage order acceptance model based on simulated annealing algorithm
下载PDF
导出
摘要 将Slotnick等人的单节点的订单选择模型扩展到多节点,给出了较复杂的多处理节点的订单排序优化模型。采用了模拟退火算法来求解所建模型的优化解,给出了详细的算法步骤和几种相邻解的搜索策略。对模拟数据进行了仿真求解计算,验证了算法的求解效果和计算效率,算例结果也表明:多节点的订单选择模型比单节点模型更加符合实际情况,能更准确地计算订单收益与延迟处罚,克服了单节点模型中的失真问题。 This paper extended the single-stage model of order acceptance presented by Slotnick to multi-stage,and presented a more complicated model of sequencing order on multi-stage processing.Employed simulated annealing algorithm to find the optimal solution of the new model,and gave the detailed algorithm steps,as well as several feasible strategies on searching neighboring solutions.Subsequently,ran the algorithm on experimental data to validate its effect on finding optimal solution and its computational effic...
出处 《计算机应用研究》 CSCD 北大核心 2009年第2期460-463,465,共5页 Application Research of Computers
基金 国家自然科学基金资助项目(70501002) 航空科学基金资助项目(2007ZG51075)
关键词 订单选择 订单排序 模拟退火算法 生产计划 order acceptance order sequencing simulated annealing algorithm production scheduling
  • 相关文献

参考文献10

  • 1SLOTNICKA S A,MORTONB T E.Order acceptance with weightedtardiness[].Computers and Operations Research.2007
  • 2GHOSTJ B.Job selection in a heavily loaded shop[].Computers and Operations Research.1997
  • 3ROUNDY R,CHEN C,CHEN P,et al.Capacity-driven acceptance ofcustomer orders for a multi-stage batch manufacturing system:modelsand algorithms[]..2005
  • 4De P,Ghosh J B,Wells C E.Job selection and sequencing on a single machine in a random environment[].European Journal of Operational Research.1993
  • 5Frank G Forst.Bicriterion stochastic scheduling on one or more machines[].European Journal of Operational Research.1995
  • 6Slotnick,SA,Morton,TE.Selecting jobs for a heavily loaded shop with lateness penalties[].Computers and Operations Research.1996
  • 7Gutjahr,W.J.,Hellmayr,A.,Pflug,G.C.Optimal Stochastic Single-Machine Tardiness Scheduling by Stochastic Branch and Bound[].European Journal of Operational Research.1999
  • 8Alidaee B,Kochenberger G A,Amini M M.Greedy solu- tions of selection and ordering problems[].European Journal of Operational Research.2001
  • 9Herbert F Lewis,Susan A Slotnick.Multi-period job selection:plann-ing work loads to maximize profit[].Computers and Operations Research.2002
  • 10Kirkpatrick S,Gelatt C,Vecchi M.Optimization by simulated annealing[].Science.1983

同被引文献76

  • 1陈浩,杜斌,黄可为.PESAⅡ算法求解基于PCVRP的热轧批量计划问题[J].控制工程,2011(S1):86-88. 被引量:5
  • 2陈志祥.生产订单综合评估的改进ELECTRE-I算法[J].成组技术与生产现代化,2005,22(2):19-21. 被引量:5
  • 3霍满臣,唐立新.面向流程工业的批在线调度问题[J].控制工程,2005,12(6):511-514. 被引量:8
  • 4Ghosh J B.Job selection in a heavily loaded shop[J].Computers and Operation Research,1997,24(2),141-145.
  • 5Simone Zanoni,Lucio Zavanella.Model and analysis of integrated production-inventory system:The case of steel production[J].International Journal of Production Economics,2005,93/94,197-205.
  • 6Rubin P A,Ragatz G L.Scheduling in sequence dependent setup environment with genetic search[J].Computers and Operations Research,1995,22,85-99.
  • 7Saboneuoglu Gurgun.A neural network model for scheduling problems[J].European Journal of Operational Research,1996,93,288-299.
  • 8Franca P M,Gendreau M,Laporte G,Muller F M.A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent of setup time[J].International Journal of Production Economics,1996,43,79-89.
  • 9Gagne C,Price W L,Gravel M.Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence dependent setup time[J].Journal of the Operations Research Society,2002,53,895-906.
  • 10Ghosh J B. Job selection in a heavily loaded shop[J]. Computers and Operation Research, 1997,24(2), 141-145.

引证文献9

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部