摘要
介绍了大型悬臂式钢木光面模板的设计、加工,及其在浇筑三峡右岸厂房混凝土墙工程现场的安装、拆除程序。
The details on designing and processing the large cantilever-type steel-wooden smooth-face forms in application to cast concrete wall of Three Gorges right-bank power plant,and the erecting and stripping procedure of these formworks are described.
出处
《湖北水力发电》
2009年第2期14-16,共3页
Hubei Water Power
关键词
光面混凝土
钢木光面模板
施工技术
smooth-surface concrete
steel-wooden smooth-face form
construction technique