期刊文献+

700 GW: A New Start of Electric Power Industry 被引量:1

700 GW: A New Start of Electric Power Industry
下载PDF
导出
摘要 On December 4, 2007, unit 1of Taizhou Power Plant was put into operation, which became the symbolic unit of the installed capacity reaching 700 GW in China. On July 31, 2008, sponsored by the National Energy Administration and assisted by the China Electricity Council and the China Guodian Corporation, the "Conferring Ceremony for the 700 GW Symbolic Generating Unit of China" was held in the Great Hall of the People, Beijing. Zhang Guobao, vice chairman of the National Development and Reform Commission and Administrator of the newly established National Energy Administration attended the ceremony and delivered an important speech. Here published is an abridgment from the speech. On December 4, 2007, unit 1of Taizhou Power Plant was put into operation, which became the symbolic unit of the installed capacity reaching 700 GW in China. On July 31, 2008, sponsored by the National Energy Administration and assisted by the China Electricity Council and the China Guodian Corporation, the "Conferring Ceremony for the 700 GW Symbolic Generating Unit of China" was held in the Great Hall of the People, Beijing. Zhang Guobao, vice chairman of the National Development and Reform Commission and ...
出处 《Electricity》 2009年第1期25-27,共3页 电气(英文版)
  • 相关文献

同被引文献10

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部