摘要 The function of the UHVDC test base of the State Grid Corporation of China (SGCC) is oriented to serve UHVDC power transmission and substation projects, especially power transmission from West China to East China, and to promote localization of UHVDC transmission and substation equipment. In essentials, this test base consists of UHVDC test transmission line, corona cage, outdoor test site, UHV test hall, pollution and environment laboratory, electromagnetic environment simulation test site, insulator laboratory, arrester laboratory and live equipment test field. This paper introduces the function and design idea of the test base, presents the main performance parameters of the above-mentioned test facilities, and summarizes the matters of concern when siting and planning. The function of the UHVDC test base of the State Grid Corporation of China (SGCC) is oriented to serve UHVDC power transmission and substation projects, especially power transmission from West China to East China, and to promote localization of UHVDC transmission and substation equipment. In essentials, this test base consists of UHVDC test transmission line, corona cage, outdoor test site, UHV test hall, pollution and environment laboratory, electromagnetic environment simulation test site, insulator labor...
出处 《Electricity》 2009年第1期38-43,共6页 电气(英文版)
  • 相关文献

参考文献10

  • 1Liu Z Y.Compilation of Researches on UHVDC Transmission Technology[]..2005
  • 2Nils H C.High Voltage Laboratory Planning[]..1992
  • 3Farzaneh M,Baker T,Bernstorf A, et al.Insulator icing test methods and procedures: a position paper prepared by the IEEE task force on insulator icing test methods[].IEEE Transactions on Power Delivery.2003
  • 4CIGRE Working Group.Electric power transmission voltages of 1000kV and above plans for future AC and DC transmission data on technical and economic feasibility and on general design information on testing facilities and the research in progress[].International Conference on Large High Voltage Electric System(CIGRE).1983
  • 5CIGRE Working Group 38-04 and Task Force 30.04.04.Electric power transmission at voltage of 1000 kV or±600 kV DC and above[].Consejo Internacional de Grandes Redes Eléctricas.1988
  • 6CHARTIERVL,SARKINENSH,STEARNSRD,et al.Investigation of corona and field effects of AC/DC hybrid transmission lines[].IEEE Transon Power Apparatus and Systems.1981
  • 7Comber MG,Zaffanella L E.The use of single-phase overhead test lines and test cages to evaluate the corona effects of EHV and UHVtransmission lines[].IEEE PES Summer Meeting&EHV/UHV Conference.1973
  • 8Yukio Nakano,Yoshitaka Sunaga.Availability of corona cage for predictingradiointerference generated fromHVDCtransmission line[].IEEETransonPowerDelivery.1990
  • 9MARUVADA P S,DROGI S.Field and ion interaction of hybrid AC/DC transmission lines[].IEEE Transactions on Power Delivery.1988
  • 10EPRI.Hybrid transmission corridor study[]..1992

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部