摘要
在屯留选煤厂铁路装车站初步设计中,采用了装车点后端设交叉渡线的方式,使得车站股道减少,机车在站作业时间缩短,提高了车站能力,节约了工程投资,收到了较好效果。
In primary design of the loading station on railway in Tunliu Coal Selecting Plant, crosstransmitting line mode at the rear loading position is used, thus rdeucing tracks, working hours of the locomotive, enlarging the capacity and saving investment, and achieved satisfactory results.
出处
《河北煤炭》
2000年第S1期1-2,7,共3页
Hebei Coal
关键词
装车站
装车点后端
交叉渡线
设计
loading station
rear loading position
crosstransmitting line
design