摘要
汾河二库大坝的基坑深、渗水量大 ,施工排水和渗水处理是大坝施工的关键。
The drainage from and the seepage treatment for the foundation pit are the key points of the dam construction of Fenhe Reservoir Ⅱ because of the deep foundation pit and of the large amount of seepage.The layout and operation concerning the drainage system in the course of foundation pit excavation and of the concrete casting are illustrated in detail.
出处
《山西水利科技》
2000年第S1期45-48,共4页
Shanxi Hydrotechnics