本文介绍了汾河二库供水发电洞进口进水塔塔筒和进口排架柱的施工工艺。
The writers introduce the construction techniqe and the construction organization method of the intake tower body and of the inlet bent columm for the water-supply tunnel of Fenhe Reservoir Ⅱ and the benefit obtained from them in this paper.
出处
《山西水利科技》
2000年第S1期55-56,共2页
Shanxi Hydrotechnics
关键词
汾河二库
供水发电洞
施工工艺
Fenhe ReservoirⅡ Water-supply Tunnel Construction